ANALISIS PEMETAAN KETERSEDIAAN BAHAN BAKU GULA AREN (ARENGA PINNATA (WURMB) MERR.) DI DESA CIKERIS, KECAMATAN BOJONG, KABUPATEN PURWAKARTA

Authors

  • Eka Satiadharma Universitas Logistik dan Bisnis Internasional , Universitas Logistik dan Bisnis Internasional image/svg+xml
  • Teguh Tuhu

DOI:

https://doi.org/10.33019/0pnqtb13

Keywords:

Palm Sugar, Raw Material Inventory, Probability, Monte Carlo Simulation, Supply Chain Sustainability

Abstract

Cikeris Village is one of the largest palm sugar production centers in Purwakarta Regency, facing supply uncertainty challenges due to seasonal factors and the perishable nature of the sap raw material. The imbalance between fluctuations in sap harvest yields and increased consumption demand risks causing future supply shortages. This study aims to predict the sustainability of palm sugar raw material availability in meeting household consumption needs in the long term. The method used in this study is stochastic simulation using the Monte Carlo approach with empirical probability distribution. Based on mapping the availability of palm sugar raw materials using Monte Carlo simulations, the sustainability of palm sugar production in Purwakarta Regency with upstream production capacity (Cikiris Village) is projected to only maintain a stable surplus status for the first fifteen years (2025–2039). The critical point of supply failure is predicted to occur for the first time sooner, namely in 2040 than at the national level (2050), until the end of the projection period. As a mitigation step against the projected supply crisis, efforts to improve the logistics system are needed.

Downloads

Download data is not yet available.

Downloads

Published

2026-11-30